ILIJAN POWER PLANT PDF

Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Zulkihn Misho
Country: Sao Tome and Principe
Language: English (Spanish)
Genre: Marketing
Published (Last): 15 August 2014
Pages: 168
PDF File Size: 11.74 Mb
ePub File Size: 2.97 Mb
ISBN: 139-9-94436-915-9
Downloads: 43237
Price: Free* [*Free Regsitration Required]
Uploader: Jujinn

From there, the gas is transported through a in-diameter onshore pipeline running 9 miles to the plant. The plant cannot operate in simple-cycle mode because it has no bypass stack.

Rita, Batangas City adjacent to Sta. Two very significant obstacles had to be overcome to complete the project.

Ilijan Combined-Cycle Power Plant – Wikipedia

Commercial operation was in October 1, Entries and comments feeds. The diesel is stored in three on-site storage tanks that are replenished through an offshore diesel fuel—unloading terminal.

Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes.

Leave a Reply Cancel reply Enter your comment here Inside the combustion chamber, the flame temperature of G combustors is between 2,F and 2,F.

But for Ilijan, the end justified the means. Each unit is composed of a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator. Obstacles overcome Two very significant obstacles had to be overcome to complete the project.

  KAREN ROBARDS FORBIDDEN LOVE PDF

Commercial operations using natural gas as the primary fuel commenced on January 1, Commercial operation of the power plant was in June 5, Ground was broken on March 15,with the start of civil construction works. The water treatment system provides a continuous supply of the high-quality demin water required for plant makeup, gas turbine water injection for NOx control, and dilution water for chemical feed systems.

The facility is being operated by Siemens Power Corporations, Inc. The power station uses diesel as back-up fuel. It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors.

Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities. To find out more, including how to control ilijah, see here: The Ilijan power plant consists of two blocks, each comprising of two gas turbine generators, and one steam turbine generator.

During natural gas firing, one operates while the other two remain on standby. The plant started using natural gas on commissioning stage in February The plant is located at Sta.

Ilijan, Batangas Powerplant

Rotor cooling air is provided with compressor discharge air extracted from the combustor poer. Intermediate steam and primary superheater ;ower steam serve as a backup for GT combustor transition piece cooling and are returned to the hot reheat steam. However, the combustor exit temperatures are different.

  DERMATOSES BULLEUSES PDF

San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan. The plant was operated on liquid fuel gas oil, naptha, condensate until the end of Notify me of new comments via email.

The plant is rated at 1, MW net on the high-voltage side of the main transformers.

Ilijan Combined-Cycle Power Plant

You are commenting using your WordPress. Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators. The ipijan treatment system works in three stages: You are commenting using your Facebook account.

Rita power plant consists of four 4 units with a plant rated capacity of MW each when operating on liquid fuel Rita power plant to the Calaca substation. You are commenting using your Twitter account. The integrated plant controls are based on the ABB Bailey distributed digital control system.

First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. REOL for the construction phase. Ilijan combined-cycle project operational summary Source: The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.